previous projects

Below showcases some of the previous projects that Times Construction have delivered, on time and meeting the customers vision and specifications

previous projects

Pathology

Before

In March 2021, we embarked on an ambitious project to transform a multipurpose space into a cutting-edge laboratory tailored to the exacting needs of modern scientific research. The original area, a blend of office space, a kitchenette, locker rooms, and seminar rooms, required a comprehensive remapping to meet the new requirements.

Our first task was to relocate all the existing contents, ensuring a smooth transition without disrupting ongoing activities. Central to the new design was a reception area specifically for processing tissue samples arriving from all over London. This area was meticulously designed to facilitate the sorting, labeling, and logging of samples before they move on for further testing within the facility.

Given the sensitive nature of the work, temporary protection and isolation of power and electrical services were critical during the renovation. We began by stripping out the existing partitions, making way for the construction of new, bespoke partitions that would better serve the lab’s functionality.

A key component of the project was the installation of a state-of-the-art ventilation system. This included both heating and cooling solutions tailored to maintain the specific climate conditions required for lab equipment and processes. In addition, suspended ceilings as well as new flooring was installed, designed to support the high foot traffic and stringent hygiene standards of a laboratory environment.

The design process was particularly intricate, as it needed to accommodate various lab processes seamlessly. This included the construction of new benches, strategically placed to optimize workflow and efficiency. Safety was also a paramount consideration; hence, we added additional doors to serve as secondary means of escape, enhancing the facility’s overall safety profile.

Despite the complexity of the project, it was completed within 24 weeks at a cost of £600,000. The result is a state-of-the-art laboratory that not only meets but exceeds modern standards, providing a highly functional space that supports critical scientific research and innovation.

This transformation stands as a testament to our commitment to excellence and our ability to adapt and innovate in response to our clients’ evolving needs.

After

previous projects

Sensory Room

We are proud to have completed the creation of a new sensory room within The Royal London Childrens Hospital. This project was executed to an exceptionally high standard despite a tight deadline. The complexity of the project stemmed from the incorporation of technologies unique to this audience.

Our primary goal was to design and build a worthwhile and engaging space for the children, enhancing their hospital experience through sensory stimulation and comfort. The success of this project is a testament to our team’s adaptability and commitment to delivering specialized, high-quality environments.

previous projects

Tranfusion Lab

We successfully completed the formation of a new transfusion lab, ensuring all areas were protected and clean throughout the process. Pre-construction and post-construction ventilation airflow checks were carried out and documented. Electrical supplies to sockets, lighting, and alarms were isolated, disconnected, and relocated as needed. Existing fixtures and fittings were stripped out and disposed of in compliance with waste transfer regulations. Close coordination was reuqired with the users of the adjasent staff wellfare room to minimise disruption.

New ceiling grids, tiles, and vinyl flooring with appropriate skirting were installed, meeting all specifications. Modifications to the supply/extract system and the BMS Control System were performed to comply with room data sheet specifications. New LED panel lighting, including emergency fittings, was installed to achieve 500 Lux lighting levels.

We extended electrical power containment to provide necessary sockets and fused spurs. Additionally, we installed stainless steel worktops with integral handwash basins, sinks, and drainers, along with HTM-compliant storage cupboards and a small table for mounting a fridge kiosk.